Our renovation process

Know what happens next.

A structured process helps protect your budget, schedule, and design decisions before construction begins.

See the five stages ↓
EstimateDesignSchedulingInstallationWarranty

Five clear stages

What happens after you contact us.

From the first estimate through design, scheduling, installation, and warranty, each stage has a clear purpose and next step.

  1. 1

    Estimate

    Share your plans and discuss the scope and budget. We confirm measurements and details before the contract is finalized.

  2. 2

    Design & preparation

    Work with your design consultant to choose finishes and prepare for the renovation.

  3. 3

    Scheduling

    Agree on a start date once the availability of your chosen materials is known.

  4. 4

    Installation

    Our installers and licensed trades carry out the work, with a project manager available for questions and changes.

  5. 5

    Warranty

    Enjoy your finished bathroom with a three-year labour warranty and the applicable manufacturer warranties.

Start With an Estimate

Before the contract

How planning and estimate costs work.

Different renovation types need different levels of measurement, layout work, and design preparation.

01

Regular bathroom

No-charge estimate

Discuss the scope, priorities, and budget. We confirm measurements before the contract is finalized.

02

Bathroom relocation or new layout

$200 for layout drawings

You keep the drawings. If you hire MDH for the estimated work, the fee is credited toward the project.

03

Kitchen and basement planning

$500 for detailed plans

Detailed 2D or 3D planning may be required. If you hire MDH for the work, the fee is credited toward the project.

Preparing for construction

A start date follows confirmed decisions.

Scheduling depends on the approved scope and the availability of the materials selected for your renovation.

Browse planning advice →
  • 01

    Scope agreed

    The estimate and contract describe the included work.

  • 02

    Selections confirmed

    Fixtures, finishes, and required products are selected.

  • 03

    Material timing known

    Orders and expected arrival dates support scheduling.

  • 04

    Start date coordinated

    The project is scheduled around the confirmed scope and material availability.

Start the first stage

Tell us about the room you want to renovate.

Share your priorities, preferred timing, and photos. Our team will review the project and follow up.