You asked three contractors for a price. One quote says $14,500. One says $19,800. One says $27,000. All three describe the same bathroom.
Which one is the real price?
None of them, until you put them side by side and read the details. This guide shows you how to compare bathroom renovation quotes in Ottawa line by line, so you pick the contractor with the right scope, not the lowest number on page one.
Why Bathroom Renovation Quotes Differ So Much
A wide price spread rarely means one contractor is greedy. It usually means each contractor priced a different job.
The common causes:
- One quote includes a waterproofing membrane behind the shower tile. Another leaves it out.
- One quote includes fixtures and tile. Another uses allowances you top up later.
- One quote includes permits, disposal, and HST. Another adds them at the end.
- One contractor plans to open the walls and fix old plumbing. Another plans to tile over it.
Most of our mid-range bathroom projects land between $10,000 and $25,000. A quote far below this range for a full renovation almost always leaves something out.
Step 1: Give Every Contractor the Same Brief
Quotes built on different plans never line up. Write one short brief and send it to every contractor.
Your brief should list:
- Room size and current layout
- What stays and what goes (tub, vanity, toilet, flooring)
- Your target finish level: builder grade, mid-range, or high end
- Must-haves, such as a walk-in shower, heated floor, or double vanity
- Your budget range and ideal start date
Share the same photos and measurements with each contractor. Now the numbers start to mean something.
Step 2: Line Up the Scope Item by Item
Build a simple table with one column per quote. Add one row for each part of the job.
Rows to Include
- Demolition and disposal
- Plumbing rough-in and fixture installation
- Electrical work, fan, and lighting
- Subfloor repair and drywall
- Shower waterproofing system
- Tile supply and installation
- Vanity, toilet, tub or shower base, and glass
- Paint, trim, and accessories
- Permits and inspections
- Cleanup and HST
Mark each row as included, excluded, or allowance. Blank rows tell you where a low quote saves money on paper.
Watch the Allowances
An allowance is a placeholder budget for items you choose later. A $500 tile allowance looks fine on a quote. The tile you love costs $1,400 installed. You pay the difference.
Ask each contractor to list allowances in dollars. Compare those numbers against the products you want, not the products they assume.
Step 3: Check the Hidden Line Items
A few items cause most of the surprise bills we see in homes across Nepean, Kanata, and Orleans.
- Rot or water damage behind old tile. Ask how each contractor prices it if found.
- Permits. Moving plumbing or adding a fixture often needs one under the Ontario Building Code.
- Venting. An undersized or unvented fan leads to mould. Check for a fan ducted to the exterior.
- Electrical upgrades. Bathrooms need GFCI protection. Older homes sometimes need a new circuit.
Ask each contractor one direct question: what happens to the price if we find damage behind the walls? A clear answer in writing is worth more than a low number.
Step 4: Compare the Contractor, Not Only the Price
Two quotes with the same scope still differ in risk. Check these points for each company:
- Years in business and a local address
- Liability insurance, with a certificate you keep on file
- A clearance certificate from the WSIB, which protects you if a worker gets hurt in your home
- Recent reviews on Google and HomeStars
- A written warranty on labour, with the length stated
- Who runs your job day to day: an in-house project manager or a rotating crew of subcontractors
Ask for two references from bathroom projects finished in the past year. Call both.
Step 5: Read the Payment Terms and Contract
The payment schedule tells you a lot about a contractor. Payments should follow progress, such as a deposit, a payment at rough-in, and a final payment at completion.
Be careful with any quote asking for most of the money up front.
Ontario law protects you here. Under the Consumer Protection Act, a contractor must not charge more than 10 percent above a written estimate without your consent. Contracts signed in your home also give you a 10-day cooling-off period.
Your contract should state:
- The full scope, matching the quote
- Start date and expected completion date
- Payment amounts and milestones
- How change orders get priced and approved
- Warranty terms
A Real Example From Barrhaven
A homeowner in Barrhaven brought us two quotes for her 5 by 9 foot main bathroom. The first came in at $13,900. The second came in at $21,500.
We built the comparison table with her. The $13,900 quote had no waterproofing membrane, a $300 vanity allowance, no permit, and no fan replacement. Once she added those items back, the low quote passed $20,000.
She stopped comparing prices and started comparing scope. The decision took ten minutes after the table was done.
Questions to Ask Yourself Before You Sign
- Do all quotes cover the same work, with the same finish level?
- Do you know the total price after allowances, permits, and HST?
- Do you trust this team to work inside your home for two to four weeks?
- Does the contract match what the salesperson told you?
For broader planning tips, the Canada Mortgage and Housing Corporation publishes renovation guidance for Canadian homeowners.
Get a Quote Worth Comparing
Miracle Dream Homes has renovated bathrooms across Ottawa since 2004. Our quotes list every line item, every allowance in dollars, and every payment milestone. One in-house team handles design, plumbing, electrical, waterproofing, tile, and glass.
Planning a smaller project first? See our powder room renovation service. For a full remodel, review our bathroom renovation service, then request a free quote. Put our numbers next to anyone else’s. We welcome the comparison.