A kitchen renovation with all the site prep work such as demolition, wall and floor prep, and electrical and plumbing work, typically takes about 4-5 weeks. A typical 800 sq.ft basement renovation takes on average 8 -12 weeks, and a typical bathroom renovation requires 1-2 weeks depending on the scope of work.